Includes: Metal main rotor housing x 1 MF95ZZ Bearing(Φ5xΦ9x2.4mm) x 2 Feathering shaft sleeve x 1(Φ8xΦ10x31mm) Damper rubber x 2(Φ7.9xΦ13x6.5mm) Spacer x 2(Φ8xΦ11.5x1.3mm) Pin x 2(Φ2x27mm) Socket collar screw x 1(M3x22mm) M3 nut x 1
I have set up the beast x on a Align 600 esp and the motor does not start when I push the collective. The blades move and the swash plate seems level. Any ideas on what to do. Any good reference sites to look for install tips? Best, Tom Craig